Relocation of goods from point A to point B requires storage.
The storage can be a part of transportation arranged for a short term (7 to 10 days) or a long period (1 month and more). The cost of storage is calculated at the daily rate per m3 of goods. After packing, a document with a list of things, their exact volume and quantity is prepared (inventory list). It is signed by the team-leader and the customer.
In case of long-term storage, we execute a contract with a stock loading list.